Factory Acceptance Test (F.A.T.)

vecteezy_workers-are-welding-metal-at-an-industrial-factory_28680099.jpg

F.A.T is conducted with our expertise at dedicated facilities prior to delivery of each equipment. This is part of our commitment to deliver quality products and meet customer satisfaction. During F.A.T, products will undergo demonstrations and verifications to ensure their installation, assembly and functionalities are in accordance to required specifications. Third party witnessing can also be engaged if required.

vecteezy_heavy-industry-engineering-factory-interior-with-industrial_11594855.jpg

Commissioning can be conducted on site if required. Our experienced commissioning team will liaise with customers' team to verify installation and connections of the products are as per design. Testing will be conducted thereafter to ensure products fulfill all operational requirements.

Commissioning